Pass 186
2026-11-06 21:03 PST (2026-11-07T05:03:06Z UTC) · commit 77870ab (77870abfba793c240f851d00622bf801b4d9f991)
ADOPTED
Quadrant prep (zero audited delta): ULPI trio exits repacked to their designed positions - DIR via slid SW on its own B line to (75.5,17.521), CK via to its southern home (76.625,17.5), NXT F exit re-laid (74.65,17.8). All three nets stay connected; DRC 19 unconnected / 154 violations identical to exp215. STP dive gate now exactly characterised: DIR/CK vias 1.125 apart (track threads at 0.56/0.565, no via fits between - needs 1.4); the southern dive field is fenced by C20’s two pads, DM_PHY’s F vertical and C22.2 - completion needs the joint DM re-lay + C22/C20 shift packing
| Nets fully routed | not recorded |
| Pins failed | not recorded |
| Clearance violations | 109 |
| Unconnected nets | 16 |
| Audit verdict | FAIL |
Routes — all copper layers and each layer
F.Cu In1.Cu In2.Cu B.Cu
Top
Bottom
← Pass 185 · all passes