Pass 20
2026-11-04 06:35 PST (2026-11-04T14:35:37Z UTC) · commit c7ed6a2 (c7ed6a223224796ac7df97e12f157bdc9b700b89)
ADOPTED
cluster clearing at the U7 south row: 66 foreign items (the XI/XO/RBIAS/+VA fanout thicket) ripped in three process batches of <=25 removes (KiCad 7 SWIG corrupts beyond a few dozen removes per process); +3V3A U7.25/30/31 then connected in seconds each through the cleared field — +3V3A is down to its main group plus U9.5. Victim nets fragmented by the clearing (unconnected-net count rises to 38; +VA/XI/XO/RBIAS/ULPI stubs to be healed by repair in the cleared field). PHY_1V8 U7.26 and PHY_1V8A U7.29 still sealed with empty fanout even in the cleared field — a pad-geometry seal, not copper. APD_A is down to D1.4 alone; clearance unchanged at the 13 APD_K-vs-pour items
| Nets fully routed | not recorded |
| Pins failed | not recorded |
| Clearance violations | 13 |
| Unconnected nets | 38 |
| Audit verdict | FAIL |
Routes — all copper layers and each layer
F.Cu In1.Cu In2.Cu B.Cu
Top
Bottom
← Pass 19 · all passes · Pass 21 →