Pass 95
2026-11-05 04:32 PST (2026-11-05T12:32:01Z UTC) · commit c10f030 (c10f0307e58c6dfd9195d19eb7e52cec03c1794a)
ADOPTED
Escapes 12 (exp52 -> exp53): PLACEMENT BREAK of the pocket seesaw – R49+R50 moved SW as a unit (-6,-5.5) into the open field south of the FBX web (one GND stitch ripped); HV_R31B re-join and HV_FBX direct hop to the web both landed. HV_RAW via refused on TP_HV stub proximity; FBX dive re-site refused by HV_VC web (restored in batch 13); HV_SS west leg refused on FBX stub – its U10 seal is geometric, mechanism named in notes.
| Nets fully routed | not recorded |
| Pins failed | not recorded |
| Clearance violations | 78 |
| Unconnected nets | 28 |
| Audit verdict | FAIL |
Routes — all copper layers and each layer
F.Cu In1.Cu In2.Cu B.Cu
Top
Bottom