Pass 107
2026-11-05 07:03 PST (2026-11-05T15:03:19Z UTC) · commit 5dcacab (5dcacab9b39eb885ab792c3c206931bf777d2bf8)
ADOPTED
Campaign + ULPI knot work (exp68 -> exp79, cumulative): general heal campaign landed 68 groups over the severance debt (post-campaign audit exp73 = 36 nets / 87 violations, down from 65/71 at respread adoption and 59/81 at pass 104); ULPI heal round rejoin (NXT); knot batches 26-30 – ULPI_D4 COMPLETE (tail into its via after the D5 vertex rip), ULPI_DIR rejoined (F seg + via placed batch 27, B legs into its staircase batch 29), USB_RST stub placed, D5/D6 fanout fences ripped for the order fix, D2 spur + D1 diagonal + CDR_DATP via ripped, D3 F approach seg placed. exp69-exp78 intra-campaign/batch states folded into this pass. ULPI residue (D1 pad group, D2, D3, D5, D6, STP) is a named knot: hand batches 22-30 + thread_far all refused on the U7 row channel shared with campaign-routed CDR_DATP/D1/D0 copper – carried as named residual, rest of board proceeds.
| Nets fully routed | not recorded |
| Pins failed | not recorded |
| Clearance violations | 87 |
| Unconnected nets | 38 |
| Audit verdict | FAIL |
Routes — all copper layers and each layer
F.Cu In1.Cu In2.Cu B.Cu
Top
Bottom
← Pass 106 · all passes · Pass 108 →