Pass 91
2026-11-05 03:39 PST (2026-11-05T11:39:02Z UTC) · commit 6d96307 (6d963074a40af544cac00855c919bf1f501d93db)
ADOPTED
Escapes 3-8 (exp42 -> exp49): +3V3A COMPLETE (U7.6 west exit, In2 hop under the ULPI bank), HV_INTVCC COMPLETE (neck-width turn through the EP/GATE window, via-up hunted to (13.4,-10.8)), HV_SS stubbed to In2, HV_FBX stubbed to a via, R34 moved 1.5mm north (placement) with APD_K/TP_HV re-joins placed. Board state per audit.
| Nets fully routed | not recorded |
| Pins failed | not recorded |
| Clearance violations | 80 |
| Unconnected nets | 27 |
| Audit verdict | FAIL |
Routes — all copper layers and each layer
F.Cu In1.Cu In2.Cu B.Cu
Top
Bottom
← Pass 90 · all passes · Pass 92 →