Pass 174
2026-11-06 11:13 PST (2026-11-06T19:13:37Z UTC) · commit fbc3caa (fbc3caa1416a7008768462cd01e1c7520b9caa8e)
ADOPTED
pass 174: north-row group — C15 nudged +1.05mm N and C14 +1.0mm E (placement iteration); CF1 re-landed via north detour y43.1, CF2 extended into moved pad; REFCLKN connected (F channel y40.44, arc over +3V3D via, gap via (66.5,41.35), B east + dive to C14.1); +3V3D_CDR U4.12 connected (F stub, via (66.2,40.55), In2 drop to own staircase vertex (66.625,38.375)). KiCad DRC: unconnected 31->29, violations 156->155 (clearance 0, shorting 0, dangling 0)
| Nets fully routed | not recorded |
| Pins failed | not recorded |
| Clearance violations | 104 |
| Unconnected nets | 25 |
| Audit verdict | FAIL |
Routes — all copper layers and each layer
F.Cu In1.Cu In2.Cu B.Cu
Top
Bottom
← Pass 173 · all passes · Pass 175 →