Pass 25
2026-11-04 07:05 PST (2026-11-04T15:05:45Z UTC) · commit aea23c7 (aea23c7a810b0961863253c140deada3b3f8e77c)
ADOPTED
U7 full-chip cluster clearing (disc 30,61 r4.5, 101 items): 9/16 connected incl. PHY_1V8A U7.29, ULPI_D0/D2/DIR, XI, +3V3A U7.30/31; ULPI_D3/D4/D6 fanout-empty; USB_RST and RBIAS search-failed; clearing also cut U7.6/16/25’s +3V3A stubs (healing owes them back)
| Nets fully routed | not recorded |
| Pins failed | not recorded |
| Clearance violations | 13 |
| Unconnected nets | 46 |
| Audit verdict | FAIL |
Routes — all copper layers and each layer
F.Cu In1.Cu In2.Cu B.Cu
Top
Bottom
← Pass 24 · all passes · Pass 26 →