Pass 96
2026-11-05 04:38 PST (2026-11-05T12:38:20Z UTC) · commit 801534a (801534acd82f7f02cf1bc095e6beb777f9f870a9)
ADOPTED
Escapes 13 (exp53 -> exp54): APD_K In2 staircase repaired (5 segments re-placed exactly after batch 12 collateral rip), HV_FBX dive via restored at (10.12,-15.38); HV_RAW F continuation refused by the APD_K via (41.12,-4.38) – batches 14-16 take the north route instead. (exp55/exp56 were intra-batch waypoints of that route, folded into the next pass.)
| Nets fully routed | not recorded |
| Pins failed | not recorded |
| Clearance violations | 78 |
| Unconnected nets | 28 |
| Audit verdict | FAIL |
Routes — all copper layers and each layer
F.Cu In1.Cu In2.Cu B.Cu
Top
Bottom
← Pass 95 · all passes · Pass 97 →