Pass 161
2026-11-06 06:25 PST (2026-11-06T14:25:47Z UTC) · commit 8990c3d (8990c3d439ed5e31b6e46034f5f9a34da57ab493)
ADOPTED
pass 161: +VA R5.1 joined - 0.5/0.3 via on R5.1 pad west edge (15.025,50.5) (APD_A 1.0 mm class pushes the legal spot to the pad edge), In1 track south to the U1.7 via (18.5,39.365). DRC: violations 156 -> 156 (class table unchanged), unconnected 48 -> 47, +VA items 2 -> 1 (only the U13 output pair remains)
| Nets fully routed | not recorded |
| Pins failed | not recorded |
| Clearance violations | 71 |
| Unconnected nets | 39 |
| Audit verdict | FAIL |
Routes — all copper layers and each layer
F.Cu In1.Cu In2.Cu B.Cu
Top
Bottom
← Pass 160 · all passes · Pass 162 →