Pass 1
2026-11-03 11:43 PST (2026-11-03T19:43:45Z UTC) · commit d0c0bca (d0c0bca09143177ae7a3f59f2cc6b8dc8500739a)
ADOPTED
Placement only: 144 footprints placed, GND zones and the HV isolation slot drawn, saved unrouted — the routing run was interrupted by a VM replacement. First committed board state; 0 of 112 nets routed.
| Nets fully routed | 0 of 112 |
| Pins failed | not recorded |
| Clearance violations | not recorded |
| Unconnected nets | not recorded |
| Audit verdict | not recorded |
Routes — all copper layers and each layer
F.Cu In1.Cu In2.Cu B.Cu
Top
Bottom
Snapshot renders were made later from the board as committed at d0c0bca. Composite render backfilled on 2026-11-04 by rendering the board file as of this pass's commit; not contemporaneous with the pass.