Pass 90
2026-11-05 03:11 PST (2026-11-05T11:11:16Z UTC) · commit 62a9130 (62a9130bd0ccd8aa74660c1a8d1cb6778b9625d8)
ADOPTED
Escape batch 1 (exp41 -> exp42): APD_K island joined to main via R34.1 pad (section I), GND R48.2 stub south (section L). The other 9 sections were refused by named blockers and are reworked in batch 2/3 with measured pad geometry. Audit follows in stats.
| Nets fully routed | not recorded |
| Pins failed | not recorded |
| Clearance violations | 77 |
| Unconnected nets | 29 |
| Audit verdict | FAIL |
Routes — all copper layers and each layer
F.Cu In1.Cu In2.Cu B.Cu
Top
Bottom
← Pass 89 · all passes · Pass 91 →