Pass 172
2026-11-06 08:56 PST (2026-11-06T16:56:56Z UTC) · commit 9448211 (9448211f01c6f570afa9d81c34cf33321fefc0a9)
ADOPTED
pass 172: HV_GATE connected (grid B path R27.1 to U10 district, F w0.15 needle thread between U10.6 pad corner and HV_SHDN via to via (31.6,-1.55), B stub to path end). DRC: unconnected 33->32, violations 156 unchanged (clearance 0, shorting 0)
| Nets fully routed | not recorded |
| Pins failed | not recorded |
| Clearance violations | 101 |
| Unconnected nets | 28 |
| Audit verdict | FAIL |
Routes — all copper layers and each layer
F.Cu In1.Cu In2.Cu B.Cu
Top
Bottom
← Pass 171 · all passes · Pass 173 →