Pass 141
2026-11-05 22:33 PST (2026-11-06T06:33:19Z UTC) · commit 3808685 (3808685177ecb2b992c03e7e2f5e28155a5c3d60)
ADOPTED
Shorts locality B: U5 west pad field (5 items). Ripped in box (61.5,-24)-(66,-14.5): I2C_SCL 4 segs, I2C_SDA 13, CDR_CLKP 25, CDR_DATN 6; deleted 4 vias in the field (CDR_CLKP at (63.12,-18.88), (62.62,-18.12), (64.62,-16.12) – the last was the one on U5.8 GND – and CDR_DATN at (65.53,-22.95)). Heal (74 s): all four nets fully reconnected, 7 groups. The I2C vias DRC had paired with U5.6/U5.5 were resolved by the re-lay (their positions in the report were the pads’; the re-laid fanout now clears the column). KiCad DRC referee, exp170 -> exp171: violations 294 -> 283, shorting_items 11 -> 6 (U5 zero; remaining are five single localities), unconnected items 46 -> 45, clearance 42 -> 37, solder_mask_bridge 17 -> 12, copper_edge_clearance 88 unchanged, track_dangling 20 -> 23 (fresh heal stubs).
| Nets fully routed | not recorded |
| Pins failed | not recorded |
| Clearance violations | 77 |
| Unconnected nets | 31 |
| Audit verdict | FAIL |
Routes — all copper layers and each layer
F.Cu In1.Cu In2.Cu B.Cu
Top
Bottom
← Pass 140 · all passes · Pass 142 →