2026-11-05 04:22 PST (2026-11-05T12:22:58Z UTC) · commit b0429cb (b0429cb4f0bb488fbfa5c17ff111f3f31b446d52)
ADOPTED
Escapes 11 (exp51 -> exp52): R50 shifted +1.14 east (fixes the batch-9 pad overlap with R31.2), HV_R31B re-join CONNECTED; FBX and HV_RAW vias refused by the CMP_QN B staircase / FBX In2 vertical (named blockers, batch 12 re-plans with a placement move); HV_SS In2 hop refused – its seal is geometric (one 1.0-class dive channel at U10 for two HV nets).
| Nets fully routed | not recorded |
| Pins failed | not recorded |
| Clearance violations | 81 |
| Unconnected nets | 27 |
| Audit verdict | FAIL |
Routes — all copper layers and each layer
F.Cu In1.Cu In2.Cu B.Cu
Top
Bottom