Pass 175
2026-11-06 11:27 PST (2026-11-06T19:27:38Z UTC) · commit 2c8a3c9 (2c8a3c94baf4e21ade88b878938ddfd9fcef01dd)
ADOPTED
pass 175: HV_SS connected (last-but-one HV net): GND U10.5 east fanout seg+via ripped (its north web keeps the pad connected - DRC-verified), HV_SS F w0.15 needle east from U10.3 through the 0.585 mm EP channel at x26.37, north past the ripped fanout, east into C30.1. Unconnected 29 -> 28, violations 155 -> 155, clearance/shorting/dangling 0
| Nets fully routed | not recorded |
| Pins failed | not recorded |
| Clearance violations | 104 |
| Unconnected nets | 24 |
| Audit verdict | FAIL |
Routes — all copper layers and each layer
F.Cu In1.Cu In2.Cu B.Cu
Top
Bottom
← Pass 174 · all passes · Pass 176 →