Pass 127
2026-11-05 17:14 PST (2026-11-06T01:14:00Z UTC) · commit 1a5ecb6 (1a5ecb63172159b0824785c7cda42821b5b75325)
ADOPTED
COURTYARD CAMPAIGN item 2 (D2 + T1 clusters): D2 (18,60)->(28,60) closing all six pairs its newly drawn courtyard revealed (L1, L2, C36, R35, U11, RJ2); C32 (40.5,-17)->(40.5,-16.4) and D11 (21,-25)->(17,-29.5) closing C32xT1 and D11xT1 (D11 boxed by D9/D10 west, T1 east/south, Q1 north; nearest pocket SW, 10 segments re-laid clean). APD_K_ALT held by relay; C32 and D11 nets unchanged. VICTIM NAMED AS OWED: APD_A_ALT D2 leg (1->2 groups) – repays in the resumed routing queue. prune_dead run after the moves. Remaining courtyard pairs: 19, of which U6xMH2 is the neither-may-move case escalated to the parent.
| Nets fully routed | not recorded |
| Pins failed | not recorded |
| Clearance violations | 118 |
| Unconnected nets | 31 |
| Audit verdict | FAIL |
Routes — all copper layers and each layer
F.Cu In1.Cu In2.Cu B.Cu
Top
Bottom
← Pass 126 · all passes · Pass 128 →