Pass 167
2026-11-06 07:24 PST (2026-11-06T15:24:58Z UTC) · commit 49f3cc6 (49f3cc6e3299ef142249348cd1f2f4ca9adfb3d5)
ADOPTED
pass 167: HV_VC + HV_VC2 connected (violations 156 -> 156, unconnected 42 -> 40). HV_VC: pure-F route R23.1 -> U10.1 threading south of the HV_FBX F chain. HV_VC2: via-in-pad at C29.1 and R23.2 with a B run passing south of the HV_R29M B staircase (the F corridor between C29.2 and R23.1 pads is 0.05 mm too narrow for a track). HV_GATE and HV_INTVCC investigated and parked as sealed: GATE’s channel between U10 EP and the east pad row fits one 0.15 track but every approach (NE diag, south run, B under the HV_SENSE staircase, In2) is blocked by named copper; INTVCC is sealed on F (SHDN via + U10.9 corner pinch), In2 (HV_FBX staircase) and B (HV_SENSE weave).
| Nets fully routed | not recorded |
| Pins failed | not recorded |
| Clearance violations | 93 |
| Unconnected nets | 35 |
| Audit verdict | FAIL |
Routes — all copper layers and each layer
F.Cu In1.Cu In2.Cu B.Cu
Top
Bottom
← Pass 166 · all passes · Pass 168 →