Pass 166
2026-11-06 07:00 PST (2026-11-06T15:00:01Z UTC) · commit 5774eff (5774effedc2c85475e6cc96dc8f3a66b36e3a6bb)
ADOPTED
pass 166: TIA_OUT COMPLETE - R7.1 joined: 0.5/0.3 via in R7.1 pad (28.1,39.25), In1 track west at y=39.9 (0.45 clear of the +VA via) to the C5.1 hop track vertex (20.3,39.9). DRC: violations 156 -> 156 (class table unchanged), unconnected 43 -> 42, TIA_OUT items 1 -> 0
| Nets fully routed | not recorded |
| Pins failed | not recorded |
| Clearance violations | 71 |
| Unconnected nets | 37 |
| Audit verdict | FAIL |
Routes — all copper layers and each layer
F.Cu In1.Cu In2.Cu B.Cu
Top
Bottom
← Pass 165 · all passes · Pass 167 →