Pass 78
2026-11-04 21:55 PST (2026-11-05T05:55:12Z UTC) · commit 6b8c0bc (6b8c0bc27e008c52c006b047df6f885ddb3fcce9)
ADOPTED
U10 locality surgery 1 (Class A): U10.7 via escape placed in its proven east window — F neck (16.79,-14.50)->(17.20,-14.50), via 0.6/0.3 @(17.20,-14.50), In2 tail ->(19.20,-14.50), every shape collision-tested pre-placement (results/surgery-u10-escape.txt). Audit: violations still 2 (D1 standing lines only), nets 31 — HV_GATE’s U10.7 group now reaches open field on In2. The companion +5V-trunk jog FAILED and is recorded: a MOS_G track fences every jog depth 18.95-20.10 (results/surgery-u10-jog.txt); U10.8/U10.9/U10.3 remain sealed by row arithmetic (0.5 pitch, 0.30 pads, 0.25 HV class: channel 0.70 < 0.75 demanded) plus that palisade.
| Nets fully routed | not recorded |
| Pins failed | not recorded |
| Clearance violations | 2 |
| Unconnected nets | 31 |
| Audit verdict | FAIL |
Routes — all copper layers and each layer
F.Cu In1.Cu In2.Cu B.Cu
Top
Bottom
← Pass 77 · all passes · Pass 79 →